Special lift

A major fire within a facility meant that all new structural work had to be carried out, FPA Ltd were invited to use their knowledge and experience to help solve the problem for removing the 4 old attenuators and replacing them with new.


FPA Ltd resolved this major issue by applying all their experience and advised the main contractor to make jetty’s for the old and new attenuators to be placed on once they had been removed, we then set about the task, to unbolt the attenuators and using our equipment winch them out of the current location onto the jetty, we then had specialised cranes that lifted them off the building top and onto the ground. To replace the new Attenuators we applied the same approach and once on the jetty, using our equipment bolted them back together.
 
The result was that we completed the task on time and in budget - The following photographs were captured during the operation.

Experience
In the Work Place

Call us on:
0121 544 4774

Factory Plant Associates Limited
10 Radbourne Drive | Halesowen | West Midlands | B63 2YD