Special lift

A major fire within a facility meant that all new structural work had to be carried out, FPA Ltd ...

  • The main problems were as follows;
  • The attenuators were located in a building that spanned from the main building by 10 meters high and 30 meters in depth
  • The current room temperatu...

Working with Pa...

Working alongside Murphy's and Hegenscheidt UK, Great Western Railway needed to replace an old wh...

The main problems were as follows;

  • Timing was crucial in order for minimum downturn on servicing the engines and carriages the allotted time to close the road (track) for the removal was 5 d...

Project Management

FPA Ltd were contacted by email to help resolve an issue with a leading filter manufacturing comp...

Their main concerns were as follows;

  • No machine could be turned off for longer than 24 hours
  • They inherited the industrial approach to ‘supply on demand’ which meant that stock and raw ...

Cost Saving

We had an email from a very well established company that was at the forefront with being an engi...

They needed assistance with merging their two sites into one location,
Again, the ergonomic pattern to their business were not to affect their customer or infringe on their own downturn, whilst ho...

Experience
In the Work Place